- Home
- Departments
- Economic & Community Development
- Planning
- Ongoing Planning Projects
- Environmental Documents
Environmental Document
The following are Final and/or Draft environmental documents currently under consideration by the City:
- Prairie Station Mitigated Negative Declaration (October 2022)
- Prairie Station MND Response to Comments (November 2022)
- Prairie Station Notice of Availability (October 20, 2022)
- Inglewood Basketball and Entertainment Ctr Notice of Preparation Feb. 20, 2018
- Faith Lutheran 3320 85th ST - Draft-IS EA-MND-2019-120
- NOE-04012020 - Lane Use Element
- NOE-04012020 - Environmental Justice Element
- NOE SP-2020-003
- Four Billboards Mitigated Negative Declaration (10.14.2020)
- Notice of Availability of Mitigated Negative Declaration-Four Billboards-October 15, 2020
Proposed Inglewood Transit Connector Project
- ITC Errata Feb 28 2022
- Inglewood Transit Connector Final EIR (February 2022)
- Inglewood Transit Connector Recirculated DEIR (November 2021)
- Inglewood Transit Connector Recirculated DEIR Appendices (November 2021)
- Inglewood Transit Connector Draft EIR (December 2020)
- Inglewood Transit Connector Appendices (December 2020)
- Inglewood Transit Connector Notice of Preparation (Revised 09.10.2020)
- Inglewood Transit Connector Notice of Preparation - Spanish (Revised 09.10.2020)
- Inglewood Transit Connector Notice of Preparation (Original 07.16.2018)
- Inglewood Transit Connector Initial Study (Revised 09.10.2020)
- Inglewood Transit Connector Initial Study (Original 07.16.2018)
- Inglewood Transit Connector Initial Study Technical Appendices (June 2018)
CEQA
- ITC Errata Feb 28 2022
- Inglewood Transit Connector Final EIR February 2022
- Inglewood Transit Connector Recirculated DEIR November 2021
- Inglewood Transit Connector Recirculated DEIR Appendices November 2021
- Envision Inglewood Website
- Inglewood Transit Connector Draft EIR
- Inglewood Transit Connector Appendices
- Inglewood Transit Connector Notice of Preparation (Revised 09.10.2020)
- Inglewood Transit Connector Notice of Preparation - Spanish (Revised 09.10.2020)
- Inglewood Transit Connector Notice of Preparation (Original 07.16.2018)
- Inglewood Transit Connector Initial Study (Revised 09.10.2020)
- Inglewood Transit Connector Initial Study (Original 07.16.2018)
- Inglewood Transit Connector Initial Study Technical Appendices
Environmental Assessment (NEPA)
Appendices 10/14/2022
- Appendix A. References
- Appendix B. List of Preparers
- Appendix C. Correspondence
- Appendix D. Environmental Commitments Record
- Appendix E. Plans, Profiles, and Operating Systems
- Appendix F. California Environmental Quality Act Documents
- Appendix G. Utilities Study
- Appendix H. Inglewood Transit Connector Design Standards and Guidelines
- Appendix I. Inglewood Transit Connector Construction Commitment Program
- Appendix J. City of Champions/Inglewood National Football League
- Appendix K. Locally Preferred Alternative Reports
- Appendix L. Transportation and Traffic Studies
- Appendix M. Visual Impact Assessment
- Appendix N. Air Quality and Greenhouse Gas Emissions Studies
- Appendix O. Biological Resources Studies
- Appendix P. Energy Calculations
- Appendix Q. Environmental Justice Technical Report
- Appendix R. Hazardous Materials Studies
- Appendix S. Section 106 Documentation
- Appendix T. Displacements and Acquisitions Technical Report
- Appendix U. Noise and Vibration Studies
- Appendix V. Draft Individual Section 4(f) Evaluation
- Appendix W. Inglewood Transit Connector Project Baseline Construction Phasing Narrative
- Appendix X. Geology and Soils Studies
- Appendix Y. Cumulative Impact Analysis Report