Skip to Main Content
Loading
Close
Loading
City Hall
Departments
Residents
Business
How Do I...
Home
Departments
Public Works
Divisions
Water Works
Water Distribution
Water Distribution
Gate Valve Replacement Program
The groundwater pumped from the City's groundwater wells is conveyed through 27 inches transmission mains to the City's water treatment plant. The distribution system comprises 152 miles of pipelines ranging in size from 6 inches to 15 inches.
Annual Water Quality Reports
Sewer System
Storm Water
Supply
Water Distribution
Water Management
Arrow Left
Arrow Right
[]
Slideshow Left Arrow
Slideshow Right Arrow